This is SleepyRiver canyon. It was constructed in the fall of 2006 and was completed in the winter of 2007. Based on the fall of a Midwest river scene with bluffs and a run off Of the Mighty Mississippi River.
Engineer Don Stops the Heavy Alco line up Of A-B-B-A’s for a low Brake Pressure light and finds the problem.
East Bound EJ&E #608 Coming out of Harkins Tunnel with a heavy load of Gravel heading for the Haddonfield Concrete Plant.
Westbound Montana Rail Link SD40-2 #265 is getting ready to pull on the Mainline after waiting for Eastbound BNSF Ac4400 #2965 Passes